mmburtch
Sleep deprived and cranky
- Joined
- Oct 11, 2006
- Messages
- 4,882
Well, after a summer living with construction the basement is nearly finished. In fact, my cave is the only room with stuff left to finish. I just need the cabineet doors and the speakers.
Comercial grade Air cleaner and a custom Glass five panel door
Wet bar. Cherry paneled walls and tile floor
The floor to ceiling cabs will be fited with wine racks and glass doors. The center cab is my new humidor, about 18cuft
Box beam ceiling
The granite
This winter I won't have to sit in the sun in the driveway in 20* weather. Yippee!
Comercial grade Air cleaner and a custom Glass five panel door
Wet bar. Cherry paneled walls and tile floor
The floor to ceiling cabs will be fited with wine racks and glass doors. The center cab is my new humidor, about 18cuft
Box beam ceiling
The granite
This winter I won't have to sit in the sun in the driveway in 20* weather. Yippee!