So, the control panel is all done, and hooked up.
Need to plumb the CFC, and wire the element connections and then the brewery is done.
Next up is the ferm chamber, working with the scrap plywood I have, and should have the bulk of the walls, top and bottom done this week. Then I will get the rest of the stuff and get it finished.
Ordered 6 pin lock kegs today for the Keezer that I will start in a few weeks.
It is all coming together, and I shold be brewing in less than a month.
T